cases

Shenzhen–Zhongshan Subsea Tunnel Project

The Shenzhen–Zhongshan Link is a major cross-sea project in the Greater Bay Area, spanning about 24 km and integrating a bridge, artificial islands, and an immersed subsea tunnel. The 6.8 km tunnel consists of 32 elements and one final joint.

Learn More

Wuhan Dongfeng Avenue China Steel Box Girder Synchronous Launching System

The Wuhan Dongfeng Avenue bridge is 5808 meters long. The L7 span over the Xinmin River is 58+89+58 meters, and needs to be launched over the Xinmin River in Wuhan, China.

Learn More

China Beipanjiang Bride Steel Truss Synchronous Incremental Launching System

The Beipanjiang is part of the Hangrui Expressway in Guizhou, Yunan province. The bridge has a total length of 1341 meter and the highest point is 594 meter about the sea level, it is so far the highest elevated bridge in the world.

Learn More

Hangshen bridge improvement lifting and widening in China

The Hangshen bridge at C60 highway need to be lifted and widen to improve the capacity of the highway.

Learn More

High Precision 3D positioning System for Hongkong-Zhuhai- Macau Express Way Bridge Tower Steel Box Fabrication

The Hongkong-Zhuhai-Macau express way link Hongkong to Macao and Zhuhai, is one of the biggest high way project  in China. The Hong Kong–Zhuhai–Macau Bridge (HZMB) is a 55-kilometre bridge-tunnel system consisting of a series of three cable stage bridge, an under sea tunnel, and four artificial island. It is both the longest sea crossing and the longest open-sea fixed link in the world.

The cable stage bridge tower with a top elevation of 120meter is fabricated with sections with precision and assembly at site.

Learn More

Korea KTX Bridge under pinning

An underground tunnel was designed to pass through a section of the Korea KTX Hight Speed Railway bride, In order to relocate the exiting piles elements that supporting the pier 28 and pier 29. A new foundation was constructed and the load on the old pile elements are to be transferred onto the new foundation before it can be removed for tunnel construction.

Learn More

Synchronised bridge lifting in Korea

A civil engineering company in Korea specializing in bridge construction and upgrading has been carry out a bridge lifting up to increase the bridge clearance.

Learn More

Computerized Strand Lifting System for PSA Port Crane Concrete Beam Installation

As part of the container port expansion for PSA Singapore in year 2007. A total numbers of 300 concrete beam weight over 600 ton each for container lifting crane are to be installed over the pier at up to 25 meter hight.

Learn More

Synchronous Lifting System for Bridge Bearing Replacement

The Dali-Lijang Expressway in Yunnan, as part of hight way bridge maintenance, the bearing that supporting the bridge girder between  the pier are to be replaced periodically.

Learn More

3D Intelligent Shipway Transport System at Jiangnan Shipyard China

Flatland shipbuilding technology has gradually become an important methods by major shipyards in China and around the world. The ships that builds are become increasingly larger, to reduce construction time and enhance productivity, , ships are constructed in modules, which are then transferred and joined together module by module.

Learn More

Weighting of 16000 Ton Oil Rig Platform By Synchronous Lifting and Weighting System

Oil rig platforms have their weight and center of gravity determined and included in the build specifications prior to commissioning and transportation

Learn More

Hydraulic Operated Ship Launching System

After a ship is constructed in the shipyard, it needs to be launched. There are several methods for launching a ship, with the two most commonly used being the slipway and floating out methods. The slipway method is the oldest and frequently used approach. In this system, the ship slides on a slideway and moves under its own weight on the waxed slideway.

Learn More

Synchronous Lifting and Pushing System for Self-Elevating Cantilever Beam Drilling Platform

The design and construction of the cantilever beam platform have improved the operational functions of the self-elevating drilling platform. It allows for drilling, well repair, and adjustment operations on the jacket production platform, which reduces the design load of the jacket platform and minimizes the cost of the platform.

Learn More

Steel Structure weighting System

A modular steel structure for the New Caledonia nickel mine, after being constructed at the shipyard, must be weighed and its centre of gravity located with a precision of 0.5% before it can be transported on a barge to the nickel mine site.

Learn More

Parachute Training System

YIPU designed and delivered the world’s first parachute training system in Singapore. This system is a practical innovation designed to meet the requirements for commandos to undergo intensive simulated training for responses and drills encountered during a parachute descent. It serves as a prerequisite before they undertake their actual parachute jump.

Learn More

Heavy Duty Generator Installation in Philippines

For the installation of large and heavy equipment, multiple heavy-duty hydraulic jacks are utilized in the lifting and lowering operations. To ensure the safe lifting and lowering of heavy loads, synchronization of all jacks is required. A computerized synchronous lifting system is now essential for such operations.

Learn More

2000 ton MDC Load calibration System in Singapore

Malayan Daching Co. (MDC) was established in 1955 in Singapore as a manufacturer and service provider of mechanical scales. From these modest beginnings, MDC has become one of the pioneers in weighing and calibration services in Singapore. Due to the increased demand for calibration of high tonnage hydraulic jacks and load cells required for pile testing, MDC needs to expand its calibration capacity to 2000 tons.

Learn More

Mobile Metro Train Lifting System for Maintenance

In contemporary metro train maintenance, electrically driven mechanical jacks are utilized to elevate the entire train at multiple jacking points. However, these jacks are not synchronized, which can lead to jamming and uneven lifting due to the unequal load at the lifting points. YIPU has developed a mobile hydraulic train lifting system specifically designed to address this issue.

Learn More

Synchronous Strand Lifting of 400 ton Steam Vessel at Vietnam

During the construction of a steam turbine power plant in Vietnam by Mitsubishi Heavy Industries Japan, a 400-ton steam storage vessel required elevation to a height of 40 meters for installation. To ensure the safe and timely completion of this lifting operation within one day, YIPU designed, delivered, and commissioned a fully automated strand lifting system for the task.

Learn More

Container Spreader Load Test System

As part of the requirement by the authority, the container spreaders are to carry out a 1.25 time overload test annually.

Learn More

Shanghai Zhangyuan Building Complex Relocation

This urban renewal project involves heritage conservation, underground space development, and the temporary relocation and restoration of above-ground historic buildings.
The works cover three Shikumen buildings with a total weight of approximately 7,500 tons and a floor area of around 4,000 square meters.

Learn More

Hydraulic Operated Slip Form Lifting System for Shanghai Centre Construction

Located in the Lujiazui Financial District of Shanghai, the Shanghai Centre is the tallest building in China, standing at a height of 635 meters. The central core of the structure was constructed using the slip form construction method, where the slip formwork moved progressively from the 5th floor to the 127th floor as concrete was poured from one floor to the next.

Learn More

Shanghai White Magnolia Plaza Slipform Work Synchronous Jacking System

Located in the central area of North Bund in Shanghai, the White Magnolia Plaza comprises three towers, with the tallest tower reaching 319.5 meters. Upon completion, it will serve as the headquarters for an international air transportation and finance center.

Learn More

Shanghai Deep Excavation Shoring Hydraulic Axial Load Monitoring and Compensation System

As urban infrastructure for underground transportation continues to develop, the frequency of deep excavations for subterranean construction has increased. Ensuring the safety of shoring systems for these excavations has become increasingly complex. It is essential to control and monitor the load changes on shoring beams to guarantee the stability and safety of the excavated pit.

Learn More

Underpinning for World Trade Centre Singapore

When the Mass Rapid Transit System was constructed underground to connect various parts of the island, a major destination was the World Trade Centre. An MRT station was planned to be built beneath the building. To facilitate the construction of the station and tunnels, the piles supporting the building had to be removed. New piles were installed, and the load of the building was transferred onto these new piles before the old ones could be removed to create the necessary space.

Learn More

Steel Box Girder Synchronous Launching System

Garden by the bay is one of the famous attraction in Singapore and integral part of Singapore’s vision to become a “City in a Garden”.
Garden by the bay is a showpiece of the horticultural and garden artistry that presents the plant kingdom in a new whole way.

Learn More

Raffles Institution Teaching Building Roof Open and Close System

At one of the teaching blocks of Raffles Institution Singapore, the atrium is equipped with a roof that can be opened and closed as needed to allow sunlight and improve ventilation on sunny days, while providing coverage during rainy days. However, according to fire safety regulations, the roof must be capable of automatically opening in the event of a fire to ensure proper ventilation within a specified minimum timeframe.

Learn More

SMU Intelligent Roof open-Close System

Unlike the roof opening system, the membrane roof at Singapore Management University is designed with a curved shape and must strictly comply with fire safety regulations, ensuring it can open within a specified time frame in the event of a fire. The primary challenge of this opening system is that it must operate by gravity without any power supply, thereby reducing the need for maintenance of standby batteries.

Learn More

Bullfighting Arena Roof Opening System in Chongdo South Korea

A bullfighting arena in Chongdo, South Korea has a round steel structure roof covered with PTFE membrane. The design includes a 30-meter diameter opening at the top for ventilation to remove animal odors. This opening can be opened or closed as needed.

Learn More